Shoeburyness Model Railway Club

Go to content

Main menu

Neva Finished

About The Club > Club Layouts

N Gauge - DC Operated

Description
Built on a interior door the clubs small N gauge layout is slowly taking shape, built by only two members it features some of the best buildings in the club. Following no particular prototype or location, it was a abandonded layout that has has new life installed into it.

See pictures below



You will be able to see "Neva Finished" at the following exhibitions during the year.


2012

Show

Club

Dates

 
 

The layout requirements are

Space requirement
- 8ft x 5ft of space, this allows the operators space to move around outside the layout.
Operators required
- The layout require two operators per day.
Power requirements
- 1 x 13amp sockets.
Transport
- Costs will be kept to a minimum, at this time the layout travels in a Citroen Berlingo sized Van, plus 1 car for operators.
Accommodation
- Accommodation is required subject to distance, over 50miles each way, where accommodation is needed the team leader will contact to discuss.

All this information including photographs diagrams and exhibition guide write up is contained within an information sheet which can be downloded.

Download the "Neva Finished"
Information Sheet.

This is only available as a PDF download.

Back to content | Back to main menu